BONUS!!! Download part of TrainingDump 1z0-1075-22 dumps for free: https://drive.google.com/open?id=1ZPdIoJWQQRF66ZxKy2Y7ICGZEQwXi0KG

Oracle 1z0-1075-22 Valid Exam Registration I think there are many but you have to choose the right one for it, We talked with a lot of users about 1z0-1075-22 practice engine, so we are very clear what you want, If you got a bad result in exam, first you can choose to wait the updating of 1z0-1075-22 exam dumps or free change to other dumps if you have other test, Oracle 1z0-1075-22 Valid Exam Registration In other to help you to break through the dilemma, we are here to provide the panacea for you.

is a senior partner in Triggle hall Rosner a strategic business consultancy Latest 1z0-1075-22 Study Plan with links to major multinationals Stephen Barker and Rob Cole, When does my work need to be finished, and what is driving that?

Download 1z0-1075-22 Exam Dumps

In fact, a current proof of the existence of this 1z0-1075-22 Sample Test Online phenomenon is Apple, It's okay to have a longer version for desktop and a shorter version formobile, Alexander Webb is a writer with a keen interest (https://www.trainingdump.com/Oracle/1z0-1075-22-practice-exam-dumps.html) in finance, emerging markets, politics, business, technology, and international travel.

I think there are many but you have to choose the right one for it, We talked with a lot of users about 1z0-1075-22 practice engine, so we are very clear what you want.

If you got a bad result in exam, first you can choose to wait the updating of 1z0-1075-22 exam dumps or free change to other dumps if you have other test, In other to (https://www.trainingdump.com/Oracle/1z0-1075-22-practice-exam-dumps.html) help you to break through the dilemma, we are here to provide the panacea for you.

2023 1z0-1075-22 – 100% Free Valid Exam Registration | Updated Oracle Manufacturing Cloud 2022 Implementation Professional Latest Study Plan

Getting a 1z0-1075-22 is very promising and many people want to get the actual test questions and answers since the exams are very hard to pass, Even if inadequate preparation for 1z0-1075-22 certification exams, you also can pass the exam and get the 1z0-1075-22 certificate.

You should update yourself when you are still young, The answer is no, Our company has employed a lot of leading experts in the field to compile the 1z0-1075-22 exam question.

You will also find in PDF, the Oracle 1z0-1075-22 exam questions of the previous exams as well as those that may likely appear in the upcoming paper, So they know our 1z0-1075-22 study material best.

That good steel must be thoroughly tempered.

Download Oracle Manufacturing Cloud 2022 Implementation Professional Exam Dumps

NEW QUESTION 38

The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.

Which two reasons could cause this?

  • A. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • B. The engineer does not have Data access to Items Attributes.
  • C. The engineer does not have Dataaccess to Item Structures.
  • D. The engineer does not have the Manage Work Definitions function privilege.
  • E. The engineer does not have Data access to Items.

Answer: A,D

NEW QUESTION 39

In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.

Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Component Returns
  • B. Report Cost Transactions
  • C. Report Material Transactions by Quantity and Serial Number
  • D. Report Receipts
  • E. Report Resource Transactions

Answer: C,E

NEW QUESTION 40

A plantruns 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.

The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.

What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

  • A. 2:00 PM
  • B. 8:00 PM
  • C. 4:00 PM
  • D. 1:00 PM
  • E. 12:30 PM

Answer: C

NEW QUESTION 41

During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.

Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Application
  • B. Oracle Business Intelligence Publisher
  • C. Oracle Business Intelligence Enterprise Edition
  • D. Oracle Business Intelligence Standard Edition

Answer: B